Challenge
Re-roof all 17 buildings of a large apartment complex as one project. The owner was fed up with the persistent roof leaks. CCC was hired to do the job right.
Solution
CCC followed a phased approach completing 4 buildings from each set up location. The roof added R-9 of insulation and upgraded the buildings with Cool Roof technology. Due to the shape of the buildings the preparation and sheet metal details were very complicated. CCC replaced over one and a half miles of edge flashing and 198 scuppers with new downspouts. The project was completed on schedule and will provide decades of leak free performance.