Mathis Brothers Furniture

Challenge

Waterproof a large building in an area with high winds and provide an energy efficient “Cool Roof” coating system on a rapid schedule to meet general contractor’s schedule

Solution

CCC mobilized two crews, two foam rigs, and a dedicated rigid insulation board installation crew. In open areas of the roof CCC was able to install the rigid insulation board and sprayed polyurethane foam at a rate of 20,000 sq. ft. per day. The project was finished ahead of schedule.

The roof system had to be installed to meet Factory Mutual’s 1-90 Wind Uplift Rating due to the high winds common in the Ontario Area. SPF roofs offer the best wind uplift performance of any commercial roof system.

The roof system provides R30 insulation over the showroom and office and R19 insulation over the warehouse. SPF roof system was coated with bright white highly reflective coating to meet “Cool Roof” requirements.

Quote from the General Contractor:
“Central Coating’s on-site crew size was more than adequate to perform the task at hand and was able to adjust to varying conditions seamlessly. You have my recommendation without reservation.”
-Tony Ageno, Project Superintendent, Devcon Construction.